Remove/demo (3) three existing underground storage tanks (UST) associated with a previously demolished fuel station. Install protection, remove concrete and paving, remove, and provide documented legal disposal of abandoned fuel tanks, provide test controlled backfill, and then restore surface with stone.
|
|
|
| 6/7/2023 1:15 PM
|
|
|
| 7/12/2023 2:00 PM
|
|
|
| SEE SOLICITATION
|
|
|
| SEE SOLICITATION
|
|
|
| 06/15/2023 @ 10:00 AM
|
|
|
| RJ Narkie, Senior Project Manager - narkie@charlottesville.gov
|
|
|
| The contractor or the contractor’s subcontractor shall have verifiable experience in the cleaning, removal, and disposal of underground fuel tanks, and shall also have experience in all associated permit and reporting requirements for fuel tank disposal. The contractor shall additionally be experienced with State and local storm water protection requirements. Contractors should provide relevant work experience information on the Vendor Data Sheet.
|
|
|
| A pre-bid conference has been scheduled for June 15, 2023, at 10:00 on site at 1505 Avon Street Extended, Charlottesville, VA 22902 (location/address). Attendance is not mandatory but is strongly recommended. Bidders not attending the pre-bid conference shall acknowledge on the bid form that they have or have not visited and inspected the site.
|
|
|
|
|
|